Sponsored by
Winner:
The Jack Copland Centre, Edinburgh
Commissioning Authority: Mary Morgan, Scottish National Blood Transfusion Service
Architect: Reiach and Hall Architects
Lead Designer: Reiach and Hall Architects
Main Contractor: Richard Coe, Kajima Interserve
Other Project Contributors: Reiach and Hall
Winner:
King's Scholars Pond Sewer Rehabilitation
Commissioning Authority: Mark Taylor, Thames Water
Lead Designer: Dr Neal Edwards, Stantec
Main Contractor: Asad Hanfi, Skanska
Other Project Contributors: Skanska
Highly Commended:
Scunthorpe Central Power Station Roof Replacement
Commissioning Authority: Rob Ingham, British Steel
Architect: TSP Projects
Lead Designer: Dave Warrior, TSP Projects
Main Contractor: Ian Pashley, TSP Projects
Other Project Contributors: Grayton, Brand Energy & Infrastructure Services UK , Boulting, Broadley Roofing, Colt International
Finalists:
- Brighton Main Line Improvement Project Nine-day blockade of Three Bridges to Brighton and Three Bridges to Lewes
- Croydon in Collaboration
- Nene Bridge Pier Strengthening
- Padstow Tidal Gate Refurbishment
- Victoria Station Upgrade
- Waterworks Bridge Reconstruction
Sponsored by
Winner:
UK Hydrographic Office, Taunton
Commissioning Authority: Jo Funnell, UK Hydrographic Office
Lead Designer: Dave Berry, Hydrock
Main Contractor: Phil Bailey, BAM Construction Ltd
Other Project Contributors: Mace
Finalists:
- 52 Lime Street
- 70 St Mary Axe
- BBC Cymru Wales Headquarters
- Cornerblock
- Hawley Wharf
- Institute of Physics
- The Ray Farringdon
Winner:
Cambridge Central Mosque
Commissioning Authority: Dr. Tim Winter, Cambridge Mosque Trust
Architect: Marks Barfield Architects
Lead Designer: Julia Barfield, Marks Barfield Architects
Main Contractor: Stephen Mulligan, Gilbert Ash
Other Project Contributors: Bidwells, Price & Myers, Blumer Lehmann, Skelly & Couch, Emma Clark with Urquhart & Hunt, Professor Keith Critchlow, Faithful & Gould
Highly Commended:
St Albans Museum + Gallery
Commissioning Authority: Annie Brewster, St Albans City and District Council/St Albans Museums and Galleries Trust/University of Hertfordshire
Architect: John McAslan + Partners
Lead Designer: Katherine Watts, John McAslan + Partners
Main Contractor: John Allworth, Willmott Dixon
Other Project Contributors: Alan Baxter Associates, Atelier 10, Gardiner and Theobald, HC, EMEC, Mowat and Co
Finalists:
- Coal Drops Yard
- Royal Opera House - "Open Up"
- Southbank Centre
- Temperate House Precinct Project
- Emerald Headingley Stadium, Leeds
- The V&A Dundee
Winner:
Shoreham Adur Tidal Walls
Commissioning Authority: Lucy Pizer, Environment Agency
Architect: Collette Paterson, Mott MacDonald
Lead Designer: Nicholas Clarke, Mott MacDonald
Main Contractor: Terry Gretton, Team van Oord
Other Project Contributors: Arcadis
Finalists:
- Morecambe Wave Reflection Wall
- SPONGE 2020
- The Ipswich Tidal Barrier Project
- Totnes Flood Defence Improvements

Winner:
Hoxton Press, Colville Estate
Commissioning Authority: Hackney Council
Architect: Karakusevic Carson Architects, David Chipperfield Architects
Lead Designer: Karakusevic Carson Architects, David Chipperfield Architects
Main Contractor: Wates Construction
Other Project Contributors: Vogt
Finalists:
- Dora Carr Close
- Material Store
- Quebec Park
- Rail overbuild at Principal Tower
- The Boiler House by HUB
- The Interlock
- Urbanest Vauxhall

Commissioning Authority: Mary Morgan, Scottish National Blood Transfusion Service
Architect: Reiach and Hall Architects
Lead Designer: Reiach and Hall Architects
Main Contractor: Richard Coe, Kajima Interserve
Other Project Contributors: Reiach and Hall
Highly Commended:
Beatrice Shilling Building
Commissioning Authority: Michael Berry, Royal Holloway, University of London
Architect: Stride Treglown Architects
Lead Designer: Cora Kwiatkowski, Stride Treglown Architects
Main Contractor: Geoffrey Osborne
Other Project Contributors: Cole Jarman
Finalists:
- Alder Hey Children's Hospital: Institute in the Park
- Channing School
- Greenwood Centre
- Institute of Physics
- Mulberry Park Community Hub, Bath
- The Garden Building, St Paul's Girls' School
- The Jack Copland Centre, Edinburgh
- The Science Oxford Centre and Wood Innovation Centre
Sponsored by
Winner:
Northern Spire
Commissioning Authority: Mark Jackson, Sunderland City Council
Architect: Jacobs
Lead Designer: Simon Fryer, Buro Happold - Roughan & O’Donnovan Design Joint Venture
Main Contractor: Stephen McCaffrey, Farrans - Victor Buyck Joint Venture
Other Project Contributors: Atkins; Faithful+Gould; McFaddans; Northumbrian Roads; Safe Track Associates; VSL; DTW
Finalists:
- Dover Western Docks Revival Scheme
- Ely Southern Bypass
- Hackney Wick Station
- Victoria Station Upgrade
- Wessex Capacity Alliance
- Wigan Bus Station
Winner:
North Wales Sludge Strategy
Commissioning Authority: Sean O’Rourke, Dwr Cymru Welsh Water
Lead Designer: Daniel Buxton, Mott MacDonald Bentley
Main Contractor: John Thornton, Mott MacDonald Bentley
Other Project Contributors: Cambi; CTM; Alfa Laval; NPS; Alpha Plus; JB Fabrications; Dunphy; LME; Merlin; Veolia; Huber; AJ Tensile
Finalists:
- CNIM Clugston Resource Recovery Centre
- Croydon in Collaboration
- Deephams STW A630 Upgrade
- Greener Grangetown
- King's Scholars Pond Sewer Rehabilitation
- Knostrop Sludge Treatment Facility
- Waterworks Bridge Reconstruction
Winner:
Greener Grangetown
Commissioning Authority: Ian Titherington, Cardiff City Council /Dwr Cymru Welsh Water/ Natural Resources Wales
Lead Designer: Chris Ellis, Arup
Main Contractor: Ken Evans, ERH Communications and Civil Engineering
Other Project Contributors: GreenBlue Urban
Sponsored by
Winner:
Tideway, More by river, applied on Thames Tideway Tunnel
Highly Commended:
Railway Paths, Alternative Corrosion Prevention for Metallic Bridges applied on Bennerley Viaduct Listed Grade II
Finalists:
- A14 Integrated Delivery Team, A14 Improvement Scheme for Water Voles
- Focus Logistics, SMARTLogistics applied on South Quay Plaza, Isle of Dogs
- Keltbray, Introducing water recycling at Borough Yards
- Sir Robert McAlpine, Fen Court
- SMB JV, Waterworks Bridge
- The Carey Group, Aggregate and soil engineering plant applied at Ford Dagenham
Winner:
Morrisroe Group with Blue Sky Building, Hugh Myddelton Primary School Outdoor Learning Centre and Urban Farm
Finalists:
- Beard, The Science Oxford Centre and Wood Innovation Centre
- Colas, Colas UK: Ambassadors for British Construction in Uganda applied at Hoima International Airport
- Costain Skanska JV, Legacy Strategy applied at HS2 Enabling Works programme-area south
- Environment Agency, Shoreham Adur Tidal Walls
- Environment Agency, Starcross & Cockwood Tidal Defence Scheme
- Environment Agency, Totnes Flood Defence Improvements
- Northern Gas Networks, Redheugh Holder Demolition Project
- Severn Trent Water, Newark Customers and Communities First Initiative applied at Newark Waste and Water Improvement Project
- Skanska, Ganton Special School Sensory Garden applied on the River Humber Gas Pipeline Replacement Project
- SMB JV, H096 New River Embankment Stabilisation
Winner:
A14 Integrated Delivery Team, The A14’s Digital Blueprint for Successful Infrastructure Delivery
Highly Commended:
Atkins, Digital Image Correlation to Improve Structural Health Monitoring on projects including Humber Bridge and the M25 Gade Valley Viaduct
Finalists:
- Balfour Beatty, Digital Ninjas – Getting our people ready for the future, today, applied within Balfour Beatty's Heathrow Framework
- Highways England, Jacobs, Bryden Wood, Rapid Engineering Modelling: Smart Motorways Programme
- Ramboll, Interactive digital reporting - Scottish and Southern Energy Networks - Overhead line reinforcement Environmental Impact Assessment (EIA) Report
- Thames Estuary Asset Management 2100, Thames Estuary Asset Management 2100 (TEAM2100)
Winner:
Atkins, Digital Construction: 3D Reinforcement Modelling for Major Civils Projects applied on Hinkley Point C
Finalists:
- BIM Academy, Forest City Digital FM Project, Malaysia
- JJ Rhatigan, Carolyn House Golden Thread Implementation Through Digital Construction
- John SISK & Son, Transforming Construction using Digital Smart Container applied at E03 Canada Gardens Wembley Park
- Sir Robert McAlpine, Advanced Data Analytics for Project Execution applied on Shepherdess Walk
- Zaha Hadid Design, Precision 3D forming of ‘The Kensington’ Sculptural JCDecaux Billboard
Winner:
Costain Skanska JV, Improving diversity across our whole workforce on HS2 Enabling works programme-area south
Highly Commended:
J Murphy & Sons, Women's Convenience Packs applied business wide
Finalists:
- BMV JV, EDI Initiatives on Oldbury Viaduct Major Renewal Scheme
- Thames Estuary Asset Management 2100, Thames Estuary Asset Management 2100 (TEAM2100)
Winner:
Thames Estuary Asset Management 2100, Thames Estuary Asset Management 2100 (TEAM2100)
Finalists:
- Clugston, CNIM Clugston [Avonmouth] Resource Recovery Centre
- Winvic Construction, SEGRO Logistics Park East Midlands Gateway
Sponsored by
Winner:
A14 Integrated Delivery Team, Procurement & Supply Chain Management: Changing Industry Behaviours
Finalists:
- Clugston, CNIM Clugston [Avonmouth] Resource Recovery Centre
- Department of Health & Social Care, ProCure22 Efficiency + Productivity Programme: Pre and Post Occupancy Evaluation Toolkit
- Fortel Services, A30 Bodmin
- Galliford Try, Derby Station remodelling: partnership approach enables early delivery
- Transport for London, The Conflict Avoidance Panel (CAP) applied on TfL's Capital Delivery Portfolio
- TSP Projects, Leeds Railway Station Southern Concourse New ETFE Roof
Winner:
A14 Integrated Delivery Team, Smart Permit to Dig (SPtD) – a Ground Breaking Process
Finalists:
- Cleveland Bridge UK, A14 River Great Ouse Viaduct
- Costain Skanska JV, Applying LEAN and Ergonomics to Archaeology in Infrastructure on HS2 Enabling Works programme-area south
- Sir Robert McAlpine, Developing a Project Data Analytics Community; transforming construction applied company wide
Sponsored by
Winner:
Robert Bird Group, Dragados & Byrne Bros, Bank Station Capacity Upgrade - Temporary Truss for London Underground
Finalists:
- Civic Engineers with Forcia, Quadrant Arcade, Regent Street
- Robert Bird Group, 21 Moorfields
- Robert Bird Group, Clarges Mayfair
- Sir Robert McAlpine, 425 Oxford Street, London
- Sir Robert McAlpine, Royal Albert Hall, London
- Tony Gee and Partners, John Lewis Store Temporary Underpinning applied at Edinburgh St James Square
- Tony Gee and Partners, West Pavilion Stability applied on Buxton Crescent Hotel & Thermal Spa
Sponsored by
Winner:
JBA Bentley, The Foss Barrier: Road to Recovery
Finalists:
- BMV, Oldbury Viaduct Temporary Works
- Cleveland Bridge UK, A14 BN20 & 21 at New Bar Hill Junction
- Galliford Try, Houlton Link Road: exceptional lift procedure for bridge beams
- Golder Associates with TfL, Turnham Green SER/ESR
- Hochtief UK, Ardleigh Green Bridge – Bridge Launches
- Wessex Capacity Alliance, Cantilevered HAKI Access Deck applied on Waterloo International Terminal
Winner: A14 Cambridge to Huntingdon Improvement Scheme- A digital blueprint for successful infrastructure delivery A14 integrated delivery team