Commercial Property Project of the Year


1 Triton Square

Commissioning Authority: British Land
Lead Designer: Arup
Lead Contractor: Lendlease
Other Project Contributors: HTC, Benchmark, SLR, Wingate, Keltbray, Electrocom, Wilson James, SES, EA-RS, Argu , Gartner, Core Group, Avondale, William Hare, OAG, Prater, Macai, Schindler, Lesterose, Cox Gomyl, Cousins, TClarke, Abbey Thermal, CRL , PAD, Byrne Bros


Bay Technology Centre

Commissioning Authority: Neath Port Talbot County Borough Council
Lead Designer: Hydrock
Lead Contractor: Morgan Sindall
Other Project Contributors: IBI Architects, The Urbanists, F P Hurley & Sons, CMBE Electrical, Central Cladding


Space Park Leicester

Commissioning Authority: University of Leicester
Lead Designer: Shepheard Epstein Hunter
Lead Contractor: Bowmer + Kirkland
Other Project Contributors: Ares Landscape Architects, Tetra Tech, CPW Phase Two, Socotech, Sweco, Stroma, Anderson Green, Mellor Bromley, Morecrofts, Norman and Underwood, Framedeck, Syston, Manson Timber Engineering glulam to atria, Monowa operable wall systems, Avonside roofing, MR Industrial metalwork/ balustades, Air Tightness Solutions, MPB concrete, MB Glass, Airedale group catering kitchen, Bespoke Building and Joinery Projects, Komfort partitions, Reynolds plasterboard and partitions, Otis lifts, Kingspan raised access floors, Boon Edam revolving door, Iko polymeric roofing membrane, EOS lightweight metal stud framing, Dolphin washroom systems, Permabond IPS systems, Velfac windows, Howdens kitchenettes


The Design District

Commissioning Authority: Knight Dragon
Lead Designer: Whitby Wood
Lead Contractor: Ardmore Construction
Other Project Contributors: 6a Architects, Adam Kahn Architects, Architecture 00, Barozzi Veiga, David Kohn Architects, HNNA, Mole Architects, Selgas Cano, Schulze + Grassov, Skelly and Couch, Scotch Partners, B&K Structures, VolkerFitzpatrick


Two Chamberlain Square

Commissioning Authority: MEPC & Federated Homes
Lead Designer: Glenn Howells Architects & MEPC
Lead Contractor: Bam Construction
Other Project Contributors: Federated Hermes, Birmingham City Council and Greater Birmingham & Solihull Local Enterprise Partnership Project Manager, Quantem Consulting, Access Consultants, All Clear Designs Acoustic Engineers, Arup, Approved Building Control Inspector, Acivico BREEAM, GWP Project Services CDM, Arup Employer’s Agent, Quantem Consulting, Ecologist, The Environmental Partnership, Fire Engineering, Arup Heritage/Townscape, Alan Baxter Lighting Consulting, Arup Local Authority, Birmingham City Council Local Planning Authority, Birmingham City Council Planning Consultant, Turley Rights of Light, Daylight and Sunlight Consultant GVA Transport Consultant, Stantec Wind Engineering, Arup, Precast, Techcrete

Cultural & Leisure Project of the Year


BAFTA 195 Piccadilly Expansion/Redesign

Commissioning Authority: BAFTA
Lead Designer: Benedetti Architects
Lead Contractor: Knight Harwood
Other Project Contributors: Jackson Coles, Equals, Price & Myers, Harley Haddow, Alan Baxter, DP9, LAPD, Charcoal Blue, Sandy Brown, Sweco, BWC Fire, Dolby, Christies, Cinema Next, Whitelight, Eyrise, IPIG, Fine Arts Moulding, Sound Solutions, Suffolk & Essex


Brent Cross Town Visitor Pavilion

Commissioning Authority: BXS LP (a JV partnership between Argent Related and Barnet Council)
Lead Designer: Moxon Architects
Lead Contractor: Red Construction
Other Project Contributors: Hybrid Structures, Kingspan, Schucco, Kone, UME


Freight Island

Commissioning Authority: Engine No 4
Lead Designer: PHAUS
Lead Contractor: Civic Engineers
Other Project Contributors: Freight Island


Gold Hill Church and Community Hub

Commissioning Authority: Gold Hill Baptist Church
Lead Designer: David Morley Architects
Lead Contractor: Jarvis Construction
Other Project Contributors: Price & Myers, Max Fordham, Michelmersh, Kawneer, Velfac, Euroclad, Rhino Precast, Nationwide Structures, Integrated Doorsets,London Wall, Baptistry UK


Kew Family Restaurant and Shop

Commissioning Authority: Royal Botanic Gardens, Kew
Lead Designer: HOK
Lead Contractor: CityAxis D&B
Other Project Contributors: Mulroy Architects, Mizzi Studio, Lumsden Design, Firecracker Works


Lambeth Palace Library

Commissioning Authority: The Church Commissioners for England
Lead Designer: Wright and Wright Architects
Lead Contractor: Knight Harwood
Other Project Contributors: Price & Myers, Max Fordham, Fanshawe, Stuart A Johnson Consulting, Dan Pearson Studio, Menzies Partners, Ibstock Swanage, Stroma, DP9, Thornton Tomasetti, Ibstock Swanage, Schueco, Rackline, Warrior, Prism, Calanpoint, MCJ, Fireworks, Schindler, Floorcraft, AJK, Bowles & Wyer


The Burrell Collection

Commissioning Authority: Glasgow Life
Lead Designer: John McAslan + Partners
Lead Contractor: Kier
Other Project Contributors: David Narro Associates, Atelier Ten, Arup, Gardiner & Theobald, Sandy Brown Acoustics, David Bonnett Associates, Jo Headland, Studio LR, Event Communication, Seeking State, CMS Window Systems, Barrisol, Kingspan Access Floors, Ronacrete, Lazenby, Optima Systems, Hunter Douglas, Guthrie Douglas, Lovair, Dupont


The Londoner

Commissioning Authority: Edwardian Hotels London
Lead Designer: Arup and Woods Bagot
Lead Contractor: McGee 
Other Project Contributors: JLL, Yabu Pushelberg, Humble Arnold Associates, Ian Munroe, Blue Sky Building, Reach Active, GIG Facade, Darwen Terracotta and Faience, Measom Dryline, Base Structures, Grants of Shoreditch Open Entrances, Richardson Roofing, Levolux, Macai Projects, EE Smith Contracts, Halsion, Mitsubishi, Berkeley Projects, PAD Contracts, Allerton Steel

Environmental Project of the Year


Figure of Three Locks

Commissioning Authority: Canal & River Trust
Lead Designer: Arcadis
Lead Contractor: Kier
Other Project Contributors: Land & Water


Hessle Foreshore Tidal Defence Scheme

Commissioning Authority: East Riding of Yorkshire Council
Lead Designer: Mason Clark Associates
Lead Contractor: Tilbury Douglas


Lincoln Flood Defences

Commissioning Authority: Environment Agency
Lead Designer: JBA Bentley
Lead Contractor: JBA Bentley
Other Project Contributors: Ivor King, RSM Maintenance, Martin Childs, IMAC


Net-Zero Carbon Accommodation Programme (NetCAP)

Commissioning Authority: Defence Infrastructure Organisation
Lead Designer: Landmarc
Lead Contractor: Reds10

Social Infrastructure Project of the Year


Crosfields School

Commissioning Authority: Crosfields School
Lead Designer: David Miller Architects
Lead Contractor: Beard Construction
Other Project Contributors: Hope and Clay, KLH, Engenuiti, Perega, CBG Consulting, Madlins, Cahill Design Consultants


HMP Five Wells

Commissioning Authority: Ministry of Justice
Lead Designer: Pick Everard
Lead Contractor: Kier
Other Project Contributors: PCE, FP McCann, Bison Precast Concrete, Banagher Precast, Assa Abloy, Crown House, HLM


Sunderland City Hall

Commissioning Authority: Sunderland City Council
Lead Designer: FaulknerBrowns Architects
Lead Contractor: Bowmer and Kirkland
Other Project Contributors: Desco, Cundall


University of Aberdeen - Science Teaching Hub

Commissioning Authority: Turner & Townsend
Lead Designer: Reiach And Hall Architects
Lead Contractor: Robertson Group
Other Project Contributors: Fairhurst, RSP Consulting Engineers, Precast Concrete, Schuco Glazing, Laboratory Specialist Services

Transport Project of the Year


Bearsted Cutting Geotechnical Engineering and Stabilisation

Commissioning Authority: Network Rail
Lead Contractor: Bam Nuttall
Other Project Contributors: Bam Ritchies


Crossrail C530: Woolwich Station

Commissioning Authority: Crossrail
Lead Designer: Mott MacDonald and Weston Williamson + Partners
Lead Contractor: Balfour Beatty
Other Project Contributors: Lifshutz Davidson, Watermans, Hoare Lea, Allies and Morrison, Arup, Atkins JV, Berkeley Homes, Otis, Kone, Sorba, Evans


Espérance Bridge

Commissioning Authority: Argent
Lead Designer: Moxon Architects
Lead Contractor: Moxon Architects
Other Project Contributors: Studio 29, Galldris, SHStructures


Regent Street Flyover

Commissioning Authority: Leeds City Council
Lead Designer: WSP
Lead Contractor: Balfour Beatty


Stourton Park and Ride, Leeds

Commissioning Authority: Leeds City Council
Lead Designer: Mott MacDonald
Lead Contractor: Bam Nuttall
Other Project Contributors: NPS Architects, MAR, EVO Energy, WSP

Upgrade & Renewal Project of the Year


1 Triton Square

Commissioning Authority: British Land
Lead Designer: Arup
Lead Contractor: Lendlease
Other Project Contributors: HTC, Benchmark, SLR, Wingate, Keltbray, Electrocom, Wilson James, SES, EA-RS, Argu , Gartner, Core Group, Avondale, William Hare, OAG, Prater, Macai, Schindler, Lesterose, Cox Gomyl, Cousins, TClarke, Abbey Thermal, CRL , PAD, Byrne Bros


Barmouth Viaduct Timber Renewal

Commissioning Authority: Network Rail
Lead Designer: Alun Griffiths
Other Project Contributors: CASS Hayward, Trackwork, H20, Mabey, EcoVigour, Attridge, MAC Scaffolding, Trackwork, Gilmour&Aitken, Thomas Plant Hire


E2 Firemain Valve & Hydrant

Commissioning Authority: Heathrow Airports
Lead Designer: Ferrovial Construction
Lead Contractor: RK Air
Other Project Contributors: Webb Yates Engineers, IWJS, Norditube


East West Rail Phase Two - Bletchley Flyover

Commissioning Authority: Network Rail
Lead Designer: Atkins
Lead Contractor: EWR Alliance (Atkins, Laing O'Rourke, Network Rail, VolkerRail)
Other Project Contributors: VolkerLaser


Figure of Three Locks

Commissioning Authority: Canal & River Trust
Lead Designer: Arcadis
Lead Contractor: Kier
Other Project Contributors: Land & Water


Regent Street Flyover

Commissioning Authority: Leeds City Council
Lead Designer: WSP
Lead Contractor: Balfour Beatty


Thames Water Mains Renewal Programme Tranche 0

Commissioning Authority: Thames Water Utilities
Lead Designer: Robert Walpole & Partners
Lead Contractor: J Browne Construction
Other Project Contributors: HDD, CMS and Capelwood


Thames Water Ring Main

Commissioning Authority: Thames Water
Lead Designer: Barhale
Other Project Contributors: Veriflo

Utility Project of the Year


Hydro Ness Archimedes Screw

Commissioning Authority: The Highland Council
Lead Designer: Hydroni
Lead Contractor: P Bradley & Company
Other Project Contributors:  Leslie Hutt, HydroNI, Moore Concrete, Hasson Engineering Solutions, M.Hasson and Sons, The Tech Guys, MacLean Formwork, Spaans Babcock, Tarmac, Tobermore Concrete Products, G20 Fabrication


Interconnexion France Angleterre 2

Commissioning Authority: National Grid Ventures
Lead Designer: BakerHicks
Lead Contractor: Hitachi
Other Project Contributors: Morgan Sindall Infrastructure


Johnson Street Storm Overflow Screening Project

Commissioning Authority: Northumbrian Water Group
Lead Designer: Esh Stantec JV
Lead Contractor: Esh Stantec JV

Other Project Contributors: Retroflo


North Sea Link

Commissioning Authority: National Grid Ventures
Lead Designer: National Grid and Statnett Engineering
Lead Contractor: Hitachi, Prysmian and Nexans


Queen Elizabeth II Reservoir

Commissioning Authority: Thames Water
Lead Designer: Mott MacDonald
Lead Contractor: Barhale
Other Project Contributors: Tarmac Concrete


Stoke Bardolph Advanced Anaerobic Digestion

Commissioning Authority: Severn Trent Water
Lead Designer: Mott MacDonald Bentley
Lead Contractor: Mott MacDonald Bentley
Other Project Contributors: Dunphy Combustion, Cambi, Huber Technology UK, Alpha Plus, Lintott Control Systems, CTM Systems, Stoke Bardolph Advanced Anaerobic Digestion


Triton Knoll Offshore Wind Farm

Commissioning Authority: RWE Renewables

Other Project Contributors: Atkins, 3SF, Boskalis, DEME, J Murphy & Sons, NKT, National Grid, Seaway 7, Siemens Energy and Vestas. 

Sharing best practice during project delivery

Carbon Net Zero Initiative of the Year


Akerlof

Initiative: Decarbonising Precast Concrete
Project applied on: New Prisons Programme

 

Bowmer + Kirkland

Initiative: Energy reduction through Flybrid smart tech
Project applied on: Various

 

Bryden Wood Technology

Initiative: Delivering a net zero carbon building with PDfMA
Project applied on: The Forge

 

Expedition Engineering

Initiative: Network Rail Low Carbon Platform Components Programme
Project applied on: Network - Wide Platform Renewals

 

HS2, HS2 Engineering Delivery Partner - Jacobs, Atkins and Sener Engineering and Systems

Initiative: HS2: journey to a net zero carbon future
Project applied on: HS2

 

Jacobs and The Environment Agency

Initiative: Net Zero Carbon Approach
Project applied on: Environment Agency's North West Flood and Coastal Risk Management Programme

 

Tony Gee and Partners

Initiative: Northumberland Energy Park (Phase 1) - Temporary Dock Closure Wall
Project applied on: Northumberland Energy Park (Phase 1)

 

Costain, Vinci Construction Grands Projets, Bachy Soletanche Joint Venture

Initiative: Secondary Lining Design Optimisation at CVB Tideway East
Project applied on: Thames Tideway East – CVB JV

 

Zaha Hadid Architects Computation and Design Group with the Block Research Group at ETH Zurich

Initiative: Striatus, an arched 3D-concrete-printed masonry bridge
Project applied on: Striatus


Sponsored by


Community Impact Initiative of the Year


Costain and Skanska Joint Venture

Initiative: Supporting homeless members of the community
Project applied on: High Speed Two Enabling Works Contract South

 

Kier

Initiative: Social Value at HMP Five Wells
Project applied on: HMP Five Wells

 

Galldris Group

Initiative: Making the community priority
Project applied on: Tedi Modular Campus - Innovation Hub

 

Network Rail and Partners

Initiative: Community-focused approach on large transportation project
Project applied on: Transpennine Route Upgrade (TRU)

 

John Sisk & Son

Initiative: E05 The Robinson, Wembley Park

 

National Grid

Initiative: National Grid London Power Tunnels Education Programme with Connectr
Project applied on: National Grid London Power Tunnels project

 

RPS Group

Initiative: RPS' Climate Careers Zone

 

VGC Group

Initiative: STEM programme
Project applied on: HS2 Section S1 and S2 – Euston to West Ruislip

 

Taylor Woodrow

Initiative: EcoPark South Project Social Value Impact
Project applied on: EcoPark South Project

 

Costain, Vinci Construction Grands Projets, Bachy Soletanche Joint Venture

Initiative: Leaving a Legacy for future generations of Londoners, above and below ground.
Project applied on: Thames Tideway East - CVB JV

 

Winvic Construction

Initiative: Winvic and IM Properties’ Mercia Park Employment Scheme
Project applied on: IM Properties’ Mercia Park

Digital Initiative of the Year


Atkins

Initiative: Digital Image Correlation in the Rail Environment
Project applied on: Network Rail Cost Efficient Electrification

 

EWR Alliance

Initiative: East West Rail Alliance approach to digital engineering
Project applied on: East West Rail Phase Two

 

FM Conway and innDex

Initiative: Digitising Westminster City Council’s Assets
Project applied on: Westminster City Council - Assets Framework (Bridges and Structures)

 

Hydrock

Initiative: Digital construction of an energy positive building
Project applied on: Bay Technology Centre

 

Jacobs

Initiative: Digital Twins on the Transpennine Route Upgrade
Project applied on: Transpennine Route Upgrade (TRU)

 

Kilnbridge

Initiative: Jobflow Application - End to End Digitisation Solution
Project applied on: Various

 

Mott MacDonald

Initiative: International BIM Pathfinder Programme
Project applied on: International BIM Pathfinder Programme

 

Environment Agency and Mott MacDonald

Initiative: NFM Sites platform
Project applied on: Leeds Flood Alleviation Scheme: Natural Flood Management Project

 

Thames Water and Stantec

Initiative: ArcGIS Tall Building Smart Application Survey System
Project applied on: Hammersmith Pressure Management and Leakage Reduction Project

 

Urban XR

Initiative: Construct.XR
Project applied on: Digi-Tech Factory and Norwich Castle Museum

Environment & Sustainability Initiative of the Year


Align

Initiative: Sustainable creation of Calcareous Grasslands
Project applied on: HS2 MWCC Contract C1

Portsmouth City Council

Initiative: The UK’s first large-scale Ecoformliner

Project applied on: North Portsea Island Coastal Defence Scheme

 

Hydrock

Initiative: Building as a power station
Project applied on: Bay Technology Centre

 

Skanska Costain STRABAG JV

Initiative: Flywheel Technology on Tower Cranes
Project applied on: Skanska Costain Strabag JV - HS2 Euston Approaches

 

Yorkshire Water, Stantec and Barhale Doosan JV

Initiative: Clifton Wastewater Integrated Constructed Wetland
Project applied on: Clifton Wastewater Treatment Works

 

Costain, Vinci Construction Grands Projets, Bachy Soletanche Joint Venture

Initiative: Resource Efficiency Matrix tool
Project applied on: Thames Tideway East - CVB Joint Venture

Health, Safety & Wellbeing Initiative of the Year


Public Works Authority

Initiative: Workers Welfare and Wellbeing initiatives on Ashghal Projects
Project applied on: Local Areas Infrastructure Programme

 

Balfour Beatty Vinci JV

Initiative: Drone deployment for safer construction
Project applied on: HS2 Main Works Civils - Area North

 

Fortel Group

Initiative: #MakeItStick Campaign
Project applied on: HS2

 

J. Murphy & Sons

Initiative: Reduction in Person Entry during Northern Outfall Sewer remediation
Project applied on: Northern Outfall Sewer

 

Jacobs

Initiative: de5ign – Framework for HSE in Design
Project applied on: High Speed 2 Phase one Contract C1

 

Network Rail

Initiative: Safety task force improving track worker safety
Project applied on: Network Rail

 

Teknobuilt

Initiative: The Plus1 approach to HSE: Breaking through the safety plateau
Project applied on: Golden Pass LNG Export Project

 

Costain, Vinci Construction Grands Projets, Bachy Soletanche Joint Venture

Initiative: How our Behavioural Approach helps to develop a generative H&S Culture
Project applied on: Tideway East

IPA’s Industry Innovation Champion


Akerlof

 

Brilliant Ideas

 

Bryden Wood Technology

 

Environment Agency & Collaborative Delivery Partners

 

EOS


HLM Architects

 

HS2

 

Keltbray

 

Kingspan Insulated Panels

 

Align JV / Alice Technologies

 

Mott MacDonald


Supported by


Partnership Initiative of the Year


Akerlof

Initiative: The Value Toolkit
Project applied on: Various

 

Arup

Initiative: Fit out of 80 Charlotte Street
Project applied on: Arup’s New Offices, 80 Charlotte Street

 

Bryden Wood Technology

Initiative: Pioneering collaboration at The Forge
Project applied on: The Forge

 

Enisca Browne and South East Water

Initiative: The Butler Summer Demand Scheme
Project applied on: Aylesford Reservoir

 

Galldris Group

Initiative: Increasing Job Awareness
Project applied on: Brent Cross Town

 

HS2

Initiative: HS2 Supply Chain Collaboration and Visibility Initiative
Project applied on: HS2

 

KBR

Initiative: Programme and Project Partners at Sellafield
Project applied on: Sellafield

 

National Grid

Initiative: London Power Tunnels 2 – Project 13 Enterprise
Project applied on: London Power Tunnels 2

 

Align

Initiative: C1-Align, a truly integrated project team
Project applied on: HS2 C1 Contract

Product Innovation of the Year


Aggregate Industries UK

Initiative: The Hope Sculpture - ECOPact Max (ultra low carbon concrete) - First UK Superstructure in 100% Cement free concrete.
Project applied on: The Hope Sculpture project

 

Brilliant Ideas

Initiative: Shutter Clip – Hollowcore Perimeter Shuttering
Project applied on: Construction Sites Across the UK

 

Brilliant Ideas

Initiative: Stacker Packers – Engineered Levelling Shim
Project applied on: Construction Sites Across the UK

 

DLT Engineering

Initiative: Self-erecting Deck Lifting Gantries
Project applied on: 1915Çanakkale Bridge

 

Environmental Techniques, Caledonia Water Alliance, Scottish Water and Good Friday Robotics

Initiative: Adapting drones for safer, improved Sewer Surveys.
Project applied on: Scottish Water Framework SR21

 

EWR Alliance

Initiative: DfMA Modular Bridges
Project applied on: East West Rail Phase Two


Extrudakerb / GCP

Initiative: Verifi - In Transit Concrete Management System
Project applied on: M6 J21A TO 26 Smart Motorway

 

Milwaukee Tool UK

Initiative: Milwaukee MX Fuel Battery powered Tower Light
Project applied on: SCS Railways HS2 project at Euston station

 

Peri

Initiative: Peri Up Easy Scaffolding
Project applied on: The Link

Productivity Initiative of the Year


Balfour Beatty Vinci JV

Initiative: Sentry
Project applied on: HS2 Main Works Civils - Area North

 

Barhale

Initiative: Pioneering dual pipejacking at North London Heat and Power Project
Project applied on: North London Heat and Power Project

 

Keltbray

Initiative: Hiper Pile – Enhancing Productivity through utilising dfMA
Project applied on: Maria Fidelis, Euston

Temporary Works Initiative of the Year


Ferrovial Construction Laing O'Rourke Joint Venture (FLO JV)

Initiative: Pour, Cure, Strike, Move, Fix - Repeat 1,000 Times!
Project applied on: Thames Tideway Tunnel (Central Section)

 

JBA Bentley

Initiative: When temporary works become permanent
Project applied on: Works Package 18 at Great Yarmouth Epoch 2 Tidal Defences

 

McGee

Initiative: The Acre: Efficiency through propping and rooftop cranes
Project applied on: The Acre - 90 Long Acre

 

Swanton Consulting

Initiative: Olympia Central Façade Retention
Project applied on: Kensington Olympia

 

Tilbury Douglas

Initiative: National Gallery of Scotland Temporary Works South Portico
Project applied on: Scottish National Galleries

 

Tony Gee and Partners

Initiative: Northumberland Energy Park (Phase 1) - Temporary Dock Closure Wall
Project applied on: Northumberland Energy Park (Phase 1)

 

Wentworth House Partnership

Initiative: Innovative sustainable temporary foundation with hybrid structural/geothermal function