Utility Project of the Year
Draycote Reservoir: Drawdown Enhancement
Mott MacDonald Bentley (MMB) were commissioned by Severn Trent Water to install three 1200mm dia. vacuum-primed siphons and modify existing facilities to increase the emergency drawdown capacity and reliability at Draycote Reservoir, used as raw water storage for supply, to ensure dam safety compliance under the Reservoirs Act 1975.
London Power Tunnels Phase 2 - Package 2
LPT Phase 2 is a great example of the mature, proactive and collaborative approach by all parties, encouraged by the NEC contract, Project13 Enterprise and HMJV’s “One Team, One Spirit” ethos which has enabled the team to outperform against project outcomes whilst focusing on innovation and leaving a positive legacy.
ML2 Sewer Protection and Enhancement
Barhale was appointed to reinforce Thames Water’s Mid Level 2 sewer, a critical part of London’s water infrastructure, against potential damage caused by the passing of HS2’s large TBMs.The business designed and delivered an exceptional project which demonstrated both outstanding engineering and a whole-hearted commitment to the community.