Sharing best practice during project delivery
Carbon Net Zero Initiative of the Year
EKFB
HS2 C23 Phase 1 Carbon Management Programme
Forest Traffic and Clearway
A38 Chudleigh: Forest Traffic Services’ Digital Care Initiative
Mott MacDonald Bentley
Embsay Water Treatment Works Water Quality Investigation
Skanska Construction UK
Electric arc furnace steel instead of basic oxygen furnace steel
Strategic Pipeline Alliance
Disruptive Carbon Reduction
Taylor Woodrow
EcoPark South Off-Grid Solution
WSP, Bournemouth, Christchurch and Poole Council, Seascape South and Footprint Architects
Durley Chine Environmental Hub
Zed Pods
The Henwood HouseCommunity Impact Initiative of the Year
Morgan Sindall Construction
Redbridge Community School Construction Academy Partnership & St. Marks Church of England School, Southampton
Morgan Sindall Construction & Infrastructure
Glebe Farm School pioneering community and sustainable legacies
Multiplex Construction Europe
The Broadway: Constructing a better future for everyone
RSHP
A ruthlessly inclusive Civic Campus for Hammersmith & Fulham
Services Design Solution
Plymouth Sound National Marine Park
Tideway
Delivering social value through its legacy programme
Vinci Building
Chester Northgate
Vinci Building
New Victoria Residential Development, Manchester
VolkerRailStory JV
Delivering Community Impact Along the Hope Valley Line
Willmott Dixon Interiors
The Power of Green - Trainee Challenge 2022Digital Initiative of the Year
Sponsored by
Align JV on behalf of HS2 by Rendel
Colne Valley Viaduct - Innovative 3D digital tools
Arup and Severn Trent, with Cada Consulting
Blue Green Digital Strategy Tool: Mansfield flood resilience
Balfour Beatty Vinci
Digital Permits
BuildData Group - Zutec
Platform to support Part L photographic evidence
Galliford Try
Project Vinnie - Predictive Analytics for Safety
HLM Architects
eDigiT2Life Research & Development
Laminar Projects
Digital transformation for EKFB (HS2) Information Management
Skanska Construction UK
5D Strategy
Skanska Construction UK
Implementation of OpenSpace on M42-J6 Improvement scheme
Skanska Construction UK
Skanska GeoBIM: The Geospatial Digital Twin for Infrastructure
Skanska Construction UK
Skanska GeoPlan: The digital construction sequencing toolEnvironment & Sustainability Initiative of the Year
Sponsored by
Balfour Beatty Vinci
Thermal Recycling of Asbestos
Bellway
Energy House 2.0
Civil Engineering and Development Department of the Government of the HKSAR, Aecom Asia and China Road and Bridge Corporation
Pioneering use of construction material and advance technologies in Cross Bay Link, Hong Kong
Costain, Vinci Construction Grands Projets and Bachy Soletanche JV
More by River Strategy
C-Probe Systems
Low carbon resilient corrosion management of parking decks
Skanska Construction UK
Electric arc furnace steel instead of basic oxygen furnace steel
Skanska Costain Strabag JV Railways
Electric piling rig
Yorkshire Water, Stantec, Ward and Burke and Gurney Environmental
Hollym, Myers Lane Wastewater Treatment Works
Zetteler
The Black & White Building's engineered timber superstructureHealth, Safety & Wellbeing Initiative of the Year
Anglian Water, Aecom and Balfour Beatty
People Operated Plant Managed Service Desk
Anglian Water @one Alliance
LIFE Fest 22
Arup
Fresh Start…and a Strong Finish
blu-3
Pioneering mental health support for blu-3 Paddington workforce
Environmental Techniques, Scottish Water, Caledonia Water Alliance, Dawson Wam, Northern Ireland Water and Good Friday Robotics
Drones Developed Specifically for Safer Internal Pipeline Surveying
Flannery Plant Hire and Spillard Safety Systems
Human Detection System
Fortel Group
South Asian Community Mental Health Support
GRS Group
Let's Talk
National Grid
The Health Hub at Mission Sellindge
VolkerRail
Building Relationships on the West Coast Mainline SiteIPA’s Industry Innovation Champion
Supported by
Alice Technologies and Skanska Costain Strabag JV
Balfour Beatty Vinci
Brilliant Ideas
Sellafield
Partnership Initiative of the Year
Sponsored by
Costain, Vinci Construction Grands Projets and Bachy Soletanche JV
A collaborative supply chain approach for better H&S performance
HS2
Supply Chain Collaboration Hub
innDex and Procore
Cocoa Works
Knights Brown
Faster. Better. Together. Portland Port Deep Water Berth
Lom architecture and design
Build-to-suit at Unity Place - Santander
Mott MacDonald
Moata on Water for Life - Hampshire programme
Programme and Project Partners at Sellafield
Collaborating to solve nuclear engineering problems on time sensitive projects
Speedy Hire and Eminox
Industry First Retrofit
Wincanton
Embedding a collaborative approach to security
Zed Pods
Zed Pods & Mid Devon District CouncilPlace Making Initiative of the Year
AL_A
Undergraduate and Access Centres for Wadham College
Arup
Gateway Linear Park for Plasdŵr
BuroHappold
Redevelopment of Battersea Power Station
Knights Brown
Dukes Meadows Pedestrian Footbridge
Plymouth City Council
Forder Valley Link Road
RSHP
A ruthlessly inclusive Civic Campus for Hammersmith & Fulham
ScottWhitbyStudio
Jubilee Pool
Services Design Solution
Plymouth Sound National Marine Park
Stantec
Waterbeach School Street
Vinci Building
Chester Northgate Development
VolkerRailStory JV
'Place Making' Along the Hope Valley LineProduct Innovation of the Year
Brilliant Ideas
Alimats - Half-Loader
Brilliant Ideas
Alimats - Load Spread Solution for MEWPS
Brilliant Ideas
Hole Cover
Cubis Systems
Multiduct
J-strut
Prop Smarter
Milwaukee Tool UK
MX FUEL 25kg class 28mm Hex Demolition Hammer
Multiplex Construction Europe
MBuild – Internal Operational Performance Management System
Strategic Pipeline Alliance
Low Water CommissioningProductivity Initiative of the Year
Sponsored by
Balfour Beatty Vinci
HS2 Mainline North - M42 Marston Box
Costain, Vinci Construction Grands Projets and Bachy Soletanche JV
Tunnel secondary lining systems for Tideway East Contract
Kilnbridge
The mobile production line inside London Power Tunnels
Network Rail
Fibre-Reinforced Polymer Footbridge ‘FLOW’
Skanska as part of the @One Alliance
Additional Storm Volume portfolio of works for Anglian Water
Skanska Costain Strabag JV
On-site Certified Rebar processing and threading facility
Wilson James
Intermodal Lifting Platform at 8 BishopsgateTemporary Works Initiative of the Year
Costain, Vinci Construction Grands Projets and Bachy Soletetanche JV
Adit construction Temporary Works Innovation
JBA Bentley
An innovative approach to protecting Grist Mill
Panthera Group
EnviroHoard reduces carbon on Jewellery Quarter Project
Pilosio
Under the Viaduct and over the City District
Riverlinx CJV (Ferrovial Construction, Bam Nuttall, SK Ecoplant)
Tunnel boring machine rotation for Silvertown Tunnels
Skanska Construction UK
SAS13 bridge - East Abutment construction and bridge move
Swanton Consulting
120 Fleet Street Basement Retention
Wentworth House Partnership
Remediation of historical gasholder for the Oval VillageRecognising successfully delivered project outcomes
Commercial Property Project of the Year
150 Holborn
Commissioning Authority: Dar GroupLead Designer : Perkins&Will
Lead Contractor: McLaren Construction
Other Project Contributors: Maffeis Engineering, Introba, Dar, Currie & Brown, Clarke Nichols Marcel, GCL, Severfield, Permasteelisa, Balfour Beatty, Skanska, Schneider Electric, Kone
Battersea Power Station
Commissioning Authority: Battersea Power Station Development CompanyLead Designer: Wilkinson Eyre Architects
Lead Contractor: Mace
Other Project Contributors: Buro Happold
Soho Place
Commissioning Authority: Derwent LondonLead Designer: Allford Hall Monaghan Morris
Lead Contractor: Laing O’Rourke
Other Project Contributors: Nimax, Gardiners & Theobald, Aecom, Arup, Haworth Tompkins, CharcoalBlue, Ian Albery, Gillieron Scott, WSP, Caneparo Associates, EQ2 Light, David Bonnett Associates, QCIC, Bureau Veritas, Gerald Eve, OAG, Explore Manufacturing, BHC, CDM, Lindner, Quest Joinery and Stortfords Interiors, Delta Fabrications and CMF, Stage Electrics, Kirwin & Simpson, GDS, James Johnson
The Rowe
Commissioning Authority: Fraser Property LondonLead Designer: Allford Hall Monaghan Morris
Lead Contractor: Bam
Other Project Contributors: Sweco, Robert Bird Group, Ridi, AJ Wells, Solus, Stortfords
Cultural & Leisure Project of the Year
Baitul Futuh Mosque Community Building
Commissioning Authority: Ahmadiyya Muslim Association (UK)Lead Designer: John McAslan + Partners
Lead Contractor: PDR Construction and Ahmad Constructions
Other Project Contributors: The Rowe Partnership, Rolfe Judd, Thornley and Lumb, JPG Structural, FES Group, PDR Construction, Ahmad Construction, Moca Crème Portuguese Milestone by LSI Stone, Weber (Saint-Gobain), IJF Developments, Axter Excel Inverted Roofing System, Roofglaze, Bilko, Vanesta, Ideal Standard, Senior Aluminium Systems, Orona, Rightcast, SDS Water Infrastructure Systems, Jura Beige, Aco
Chester Northgate Development
Commissioning Authority:Cheshire West and Chester CouncilLead Designer: AHR Architects
Lead Contractor: Vinci Building
Other Project Contributors: Curtins, Hoare Lea, HE Simm, Bora Groundworks, Hambleton, Apec, Stock Brickwork, Huyton Civils
Game of Thrones Studio Tour
Commissioning Authority:Linen Mill StudiosLead Designer:McAdams Design
Lead Contractor:Farrans Construction
Other Project Contributors:Hamilton Robson, Michael Nugent, Surface Prep NI, Cole Groundworks, CCL, Walter Watson Structural Steel
Jubilee Pool
Commissioning Authority:Jubilee Pool PenzanceLead Designer:ScottWhitbyStudio
Lead Contractor:Catling Construction
Other Project Contributors:Webb Yates Engineers, GEON - GEL Geothermal Engineering, Arup, Fox Cornwall, PT Projects, A1 Construction Penzance, ESW, Fibreglass
National Portrait Gallery Redevelopment
Commissioning Authority:National Portrait GalleryLead Designer:Jamie Fobart Architects
Lead Contractor:Gilbert-Ash
Other Project Contributors:Purcell, Max Fordham, Price & Myers, William Coates, Red Hammer Demolition, Jackson Lifts, Turner & Townsend Decorating, Bann Joinery, Keenwood Joinery, Restore London, Lazenby Contracts, Stonefit, FGM, Bassett & Finlay, Moore Concrete & Trench Co, Elite Doors, Jackson Lifts
St Johns College Libraries Refurbishment
Commissioning Authority:St John's College, The University of OxfordLead Designer:Wright & Wright Architects
Lead Contractor:Beard
Other Project Contributors:Price Myers, Max Fordham Consulting Engineers, Peter Gittens Associates, Szerelmey, Owlsworth, Neil Burke Joinery, Bojen Electrical, Oxford Pipework Services
Thomas Hardy House & Dugdale Arts Centre
Commissioning Authority:London Borough of EnfileldLead Designer:Pick Everard
Lead Contractor:Willmott Dixon Interiors
Other Project Contributors:TP Bennett, Desso, Purmo Group, Valliant Group, Knauf, IKO, Whitecroft, Euroclad Group, AkzoNobel, IdealStandard, Cellecta, Rockfon, Tarkett. MK
Wokingham Leisure Centre & Library Complex at Carnival Hub
Commissioning Authority:Wokingham Borough CouncilLead Designer:HLM Architects
Lead Contractor:Pellikaan Construction
Other Project Contributors:Arup, Ruane CDC, Faithful & Gould, Cundall, DHA, Steelconstruction, Adstone Welfare, Portakabin Temporary site supplies, TJ Electrical Vibro, Keller Foundations Groundworks, PP Construction, BCSolutions, FT Leisure, HYoung, DIS, Barrie Beard, Structura, Cornish Concrete Products, Elite Aluminium, MSW UK, Trenomat De Graaf en van Stijn Splashzone Iplay, Sheridan Roof, H. McLarnon & Son, AGB, SafeSite Breeam, Ecoteric, Academy Consulting, Intumescent, SDH, Heritage Brickwork, C&I Southwest Decoration, KSturge,, cubicles, IPS, Prospec, Bison, Poolview, Forge Leisure, Hussey, Courtcraft, Steward Design Panels, Hutchinson Sub-station, Ipsum Utilities, SSE, Evolution Tiling, CSY, Derako Hard, Universal Services, APG Leisure, Roberts Limbrick Architects
Environmental Project of the Year
A31 Ringwood Bridge Replacement & Widening Scheme
Commissioning Authority:
National Highways
Lead Designer:
Stantec
Lead Contractor:
VolkerFitzpatrick
Mill Fleam Pumping Station
Commissioning Authority:
Derby City Council
Lead Designer:
JBA Bentley
Lead Contractor:
JBA Bentley
Porthcawl Sandy Bay Coastal Scheme
Commissioning Authority:
Bridgend County Borough Council
Lead Designer:
Arup
Lead Contractor:
Knights Brown
Other Project Contributors:
WSP
The Corran Narrows Project
Commissioning Authority:
SSE
Lead Designer:
SSE/OCU
Lead Contractor:
OCU
Other Project Contributors:
Corrigan Contractors
Residential Project of the Year
Hill Street House
Commissioning Authority: Linc Cymru Housing Association
Lead Designer: Zed Pods
Lead Contractor: Zed Pods
Other Project Contributors: Tata Steel, Rockwool, Rationel Windows & Doors
Magna Square
Commissioning Authority: Places for People
Lead Designer: Allford Hall Monaghan Morris
Lead Contractor: Graham Construction
Other Project Contributors: Goddard Consulting, Swift Brickwork Contractors, NA Curtain Walling, Hailsham Structures, Runnymede Borough Council
New Victoria, Manchester
Commissioning Authority: Muse Developments
Lead Designer: Sheppard Robson
Lead Contractor: Vinci Building
Other Project Contributors: Arup, AJP, HE Simm, Mayo, FK Group, JCS
Yr Hafan
Commissioning Authority: Cardiff Council
Lead Designer: Beattie Passive
Lead Contractor: Beattie Passive
Other Project Contributors: Cercula, Mead Consulting
Social Infrastructure Project of the Year
Glebe Farm School, Milton Keynes
Commissioning Authority:
Milton Keynes City Council
Lead Designer:
Synergy Architects
Lead Contractor:
Morgan Sindall Construction & Infrastructure
Other Project Contributors:
Aecom, Currie & Brown, Munro
Headley Court Veterans’ Orthopaedic Centre
Commissioning Authority:
Robert Jones and Agnes Hunt Orthopaedic Hospital NHS Foundation Trust
Lead Designer:
Pinnegar Hayward
Lead Contractor:
Pave Aways
Other Project Contributors:
Clancy Consulting, Headley Court Charity
Maggie's Southampton
Commissioning Authority:
Maggie's
Lead Designer:
AL_A
Lead Contractor:
Sir Robert McAlpine
Other Project Contributors:
Arup, Ceramica Cumella, Inox-Colour, Sky-Frame, Schüco, Gillespie, Kvadrat, IKO Polymer, Eco Green Roofs, Gravity Solutions, Sarah Price Landscapes
Wadham College
Commissioning Authority:
Wadham College, University of Oxford
Lead Designer:
AL_A
Lead Contractor:
Beard Construction
Other Project Contributors:
Arup, Bidwells, Gleeds, Turnberry, Ridge, Churchman Thornhill Finch, Eckersley O'Callaghan, Colorminium, CRICURSA, Anodisers, Barn 6, Johnsons Wellfield
Transport Project of the Year
Sponsored by
A31 Ringwood Bridge Replacement & Widening Scheme
Commissioning Authority:
National Highways
Lead Designer:
Stantec
Lead Contractor:
VolkerFitzpatrick
Bank Station Capacity Upgrade Project
Commissioning Authority:
London Underground
Lead Designer:
Dragados
Lead Contractor:
Dragados
Other Project Contributors:
URS, Wilkinson Eyre Architects, Dr Sauer, Augustus & Ham , OTB, Scott Lister, Geocisa, Alan Baxter, Robert Bird Group, Alan Auld, McNicholas, Byrne Bros, Geocisa, VVB Engineering, A.S.M. Engineering, Joseph Gallagher, Munnelly, Keltbray, Cleshar, OTIS, KONE, Pyramid, SAS International, Lynch, Fourway Communication, McGee Demolitions, DMC, ASG, Impact Controls, R Stevens & Sons, Rhino, ASSA Abloy, Systech, T Clarke, OMC, Links Signs, Silenzio, Cemex, Hanson, HILTI, Thurrock Supplies, Mapei
Barking Riverside Pier
Commissioning Authority:
Barking Riverside
Lead Designer:
Beckett Rankine
Lead Contractor:
McLaughlin & Harvey
Other Project Contributors:
Anthony Carlile, Ravestein
East Leeds Orbital Route
Commissioning Authority:
Leeds City Council
Lead Designer:
AtkinsRéalis
Lead Contractor:
Balfour Beatty
Other Project Contributors:
Knight Architects, Tarmac
Forder Valley Link Road
Commissioning Authority:
Plymouth City Council
Lead Designer:
Balfour Beatty
Lead Contractor:
Balfour Beatty
Other Project Contributors:
Aecom, WSP, Scape
SAS13 Bridge
Commissioning Authority:
Network Rail
Lead Designer:
Tony Gee and Partners
Lead Contractor:
Skanska UK
Other Project Contributors:
AtkinsRéalis, Severfield, MPB, CRSA, Cementation Skanska, Armac, J Gallagher, Macrete Precast, Ekspan, Volker Laser, EMJ, Tarmac Concrete, GRS
The Elizabeth Line
Commissioning Authority: CrossrailLead Designer: Crossrail
Other Project Contributors: Line-wide design: AtkinsRéalis, Grimshaw, GIA Equation, Maynard| Paddington: WSP, Weston Williamson, Costain Skanska JV | Bond St: Arup, John McAslan, Costain Skanska JV | TCR: WSP, Hawkins Brown, Laing O’Rourke | Farringdon: AtkinsRéalis, Bam Ferrovial Kier JV | Liverpool St: Arup, Hawkins Brown, WilkinsonEyre, Laing O’Rourke | Whitechapel: Baker Hicks, Balfour Beatty, Morgan Sindall and Vinci JV | Canary Wharf: Arup, Adamson Associates, Canary Wharf Contractors | Custom House: Ramboll, Allies and Morrison, Laing O’Rourke | Woolwich: Mott MacDonald, Weston Williamson, Balfour Beatty | Abbey Wood: Fereday Pollard, Balfour Beatty | Other Suppliers: GRCUK, SORBA, Lindner, AJ Wells, Merson, Wood and Wood, Future Design, Designplan, Knorr Bremse, Waagner Biro & Qualter Hall, Byrne Brothers, WACO, iGuzzini, Evans Concrete, Explore Manufacturing, WIEHAG
Upgrade & Renewal Project of the Year
Battersea Power Station
Commissioning Authority:
Battersea Power Station Development
Lead Designer:
Wilkinson Eyre Architects
Lead Contractor:
Mace
Other Project Contributors:
Buro Happold
Bradford Beck Culvert Remediation Scheme
Commissioning Authority:
Bradford Council
Lead Designer:
JBA Bentley
Lead Contractor:
J N Bentley
Other Project Contributors:
Price and Myers, Peter Duffys
Euston Station
Commissioning Authority:
Network Rail
Lead Designer:
AtkinsRéalis
Lead Contractor:
Skanska
Other Project Contributors:
Danny Sullivan
Fibre-Reinforced Polymer Footbridge ‘FLOW’
Commissioning Authority:
Network Rail
Lead Designer:
Knight Architects
Lead Contractor:
Network Rail
Other Project Contributors:
Jacobs, Q-Railings, JT Consulting, KS Composite, Sui Generis, Epsilon Optics, Foflo
Finsbury Park Access for All Scheme
Commissioning Authority:
Network Rail
Lead Designer:
Network Rail
Lead Contractor:
Barhale
Other Project Contributors:
Crouch Waterfall, OTB, Global Rail
Niagara Weir Stabilisation & Fish Pass
Commissioning Authority:
Yorkshire Water
Lead Designer:
Ward & Burke
Lead Contractor:
Ward & Burke
Other Project Contributors:
JBA, Galliford Try, Burn Fencing, Midland Valves
Queen’s Bridge Siphons
Commissioning Authority:
Northern Ireland Water
Lead Designer:
Environmental Techniques
Lead Contractor:
Good Friday Robotics
Other Project Contributors:
Doran Consulting, Dawson Wam, Insituform, Scottish Water, Caledonia Water Alliance
Utility Project of the Year
Army Basing Programme Utility Works
Commissioning Authority:
Defence Infrastructure Organisation
Lead Designer:
MUJV
Lead Contractor:
MUJV
Other Project Contributors:
Aspire Defence, UKPNS, Jacobs, Rush Construction Services, LPC, Blu-3, Veolia, GS Energy, Schneiders, Keyline, Wolseley, CPPUL, RW Langley, SDS
Durleigh Water Treatment Centre Refurbishment
Commissioning Authority:
Wessex Water
Lead Designer:
Aecom
Lead Contractor:
Wessex Water - Engineering and Sustainable Delivery (Wessex Water Internal Construction)
Other Project Contributors:
Stantec, Freeflow, Carneys, FSD, Berry and Escott, Dans Engineering, Dawson Wam, VESSCO, GPS, Hydro, Freeflow, Rotork, AVK, Xylem, Doosan, Cadar
Embsay Water Treatment Works
Commissioning Authority:
Yorkshire Water
Lead Designer:
Mott MacDonald Bentley (MMB)
Lead Contractor:
Mott MacDonald Bentley (MMB)
Mission Sellindge
Commissioning Authority:
National Grid Ventures
Lead Designer:
Jacobs
Lead Contractor:
National Grid
Other Project Contributors:
Murphys, Omexom, Mott McDonald, GE, Prysmian, Celtics, Tyco, HadFab, MCP, Centara
Queen’s Bridge Siphons
Commissioning Authority:
Northern Ireland Water
Lead Designer:
Environmental Techniques
Lead Contractor:
Good Friday Robotics
Other Project Contributors:
Doran Consulting, Dawson Wam, Insituform, Scottish Water, Caledonia Water Alliance
The Greenway Trunk Sewer Diversion
Commissioning Authority:
Thames Water
Lead Designer:
Mott MacDonald
Lead Contractor:
Barhale
Other Project Contributors:
BCS Group, FP McCann, Woodhorn Group, Springbridge, WJ Groundwater, Berryrange, Kilnbridge, Flannerys
NIC Design Principles Award
Barking Riverside Pier
Commissioning Authority:
Barking Riverside
Lead Designer:
Beckett Rankine
Lead Contractor:
McLaughlin & Harvey
Other Project Contributors:
Anthony Carlile, Ravestein
Durleigh Water Treatment Centre Refurbishment
Commissioning Authority:
Wessex Water
Lead Designer:
Aecom
Lead Contractor:
Wessex Water - Engineering and Sustainable Delivery (Wessex Water Internal Construction)
Other Project Contributors:
Stantec, Freeflow, Carneys, FSD, Berry and Escott, Dans Engineering, Dawson Wam, VESSCO, GPS, Hydro, Freeflow, Rotork, AVK, Xylem, Doosan, Cadar
East Leeds Orbital Route
Commissioning Authority:
Leeds City Council
Lead Designer:
AtkinsRéalis
Lead Contractor:
Balfour Beatty
Other Project Contributors:
Knight Architects, Tarmac
Fibre-Reinforced Polymer Footbridge ‘FLOW’
Commissioning Authority:
Network Rail
Lead Designer:
Knight Architects
Lead Contractor:
Network Rail
Other Project Contributors:
Jacobs, Q-Railings, JT Consulting, KS Composite, Sui Generis, Epsilon Optics, Foflo
Porthcawl Sandy Bay Coastal Scheme
Commissioning Authority:
Bridgend County Borough Council
Lead Designer:
Arup
Lead Contractor:
Knights Brown
Other Project Contributors:
WSP
SAS13 Bridge
Commissioning Authority:
Network Rail
Lead Designer:
Tony Gee and Partners
Lead Contractor:
Skanska UK
Other Project Contributors:
AtkinsRéalis, Severfield, MPB, CRSA, Cementation Skanska, Armac, J Gallagher, Macrete Precast, Ekspan, Volker Laser, EMJ, Tarmac Concrete, GRS
The Elizabeth Line
Commissioning Authority: CrossrailLead Designer: Crossrail
Other Project Contributors: Line-wide design: AtkinsRéalis, Grimshaw, GIA Equation, Maynard| Paddington: WSP, Weston Williamson, Costain Skanska JV | Bond St: Arup, John McAslan, Costain Skanska JV | TCR: WSP, Hawkins Brown, Laing O’Rourke | Farringdon: AtkinsRéalis, Bam Ferrovial Kier JV | Liverpool St: Arup, Hawkins Brown, WilkinsonEyre, Laing O’Rourke | Whitechapel: Baker Hicks, Balfour Beatty, Morgan Sindall and Vinci JV | Canary Wharf: Arup, Adamson Associates, Canary Wharf Contractors | Custom House: Ramboll, Allies and Morrison, Laing O’Rourke | Woolwich: Mott MacDonald, Weston Williamson, Balfour Beatty | Abbey Wood: Fereday Pollard, Balfour Beatty | Other Suppliers: GRCUK, SORBA, Lindner, AJ Wells, Merson, Wood and Wood, Future Design, Designplan, Knorr Bremse, Waagner Biro & Qualter Hall, Byrne Brothers, WACO, iGuzzini, Evans Concrete, Explore Manufacturing, WIEHAG