2021 Winners
CARBON NET ZERO INITIATIVE OF THE YEAR
Winner:
Jacobs and the Environment Agency
Carbon reduction in the use of concrete
Highly Commended:
Byrne Bros
Byrne Bros’ reducing embodied carbon in concrete
Finalists:
Byrne Bros
Byrne Bros’ reducing embodied carbon in concrete
Fortel Group
Fortel - Schools Go Green & F18
HLM Architects
Dinton Activity Centre
Circular Twin
HLM Architects, Morgan Sindall, Scape Procure, Cundall & Lungfish Architects
Jacobs and the Environment Agency
Carbon reduction in the use of concrete
JN Bentley
Great Yarmouth Tidal Defences Epoch 2
Public Works Authority (Ashghal)
Ashghal's Roads Projects Department (RPD)

CLIMATE RESILIENCE PROJECT OF THE YEAR
Winner:
Boston Barrier Scheme, Lincolnshire
Commissioning Authority: Environment Agency
Lead Architect: Mott MacDonald
Lead Consultant: Mott MacDonald
Lead Contractor: Bam Nuttall
Other Project Contributors: Turner & Townsend, Jacobs, Hollandia Infra
Highly Commended:
Hythe Ranges Sea Defences Scheme, Kent
Commissioning Authority: Environment Agency
Lead Architect: Van Oord
Lead Consultant: Van Oord
Lead Contractor: Van Oord
Other Project Contributors: Arcadis, Binnies, Jacobs, JBA, Turner & Townsend,Van Oord, Mackley
Finalists:
Bentley Ings Pumping Station
Commissioning Authority: Environment Agency
Lead Consultant: JBA Bentley
Lead Contractor: JBA Bentley
Other Project Contributors: Robinsons M&E, Watermark, Ron Hull Demolition, iLine; Peter Duffy, Shenton Group, Xylem, Selwood, Westwood Pipelines
Boston Barrier Scheme
Commissioning Authority: Environment Agency
Lead Architect: Mott MacDonald
Lead Consultant: Mott MacDonald
Lead Contractor: BAM Nuttall
Other Project Contributors: Turner & Townsend, Jacobs, Hollandia Infra
HHF Flood Defence Improvements
Commissioning Authority: Environment Agency
Lead Architect: Mott MacDonald
Lead Consultant: Mott MacDonald
Lead Contractor: BAM Nuttall
Other Project Contributors: Arcadis, Jacobs
Hythe Ranges Sea Defences Scheme
Commissioning Authority: Environment Agency
Lead Architect: Van Oord
Lead Consultant: Van Oord
Lead Contractor: Van Oord
Other Project Contributors: Arcadis, Binnies, Jacobs, JBA, Turner & Townsend,Van Oord, Mackley
Lincolnshire Beach Management 2018-20
Commissioning Authority: Environment Agency
Lead Consultant: Jacobs
Lead Contractor: Team Van Oord
Mytholmroyd Flood Alleviation Scheme
Commissioning Authority: Environment Agency
Lead Architect: Jacobs
Lead Consultant: VBA
Lead Contractor: VBA
Other Project Contributors: VBA, Boskalis Westminster and SNC-Lavalin's Atkins business, Arcadis, Turner and Townsend, VolkerGround Engineering, VolkerBrooks, Volkerlaser, Burn Fencing, Anchor Systems, Huyton Asphalt, Jacobs
Replacement Pooley Bridge
Commissioning Authority: Cumbria County Council
Lead Architect: Knight Architects
Lead Consultant: Mott MacDonald
Lead Contractor: Eric Wright Civil Engineering
Other Project Contributors: Knight Architects, GHD, Eric Wright Civil Engineering, WEC
Q2 King's Cross Sports Hall
Commissioning Authority: Kings Cross Central Limited Partnership (KCCLP)
Lead Architect: Stride Treglown
Lead Consultant: Stride Treglown
Lead Contractor: BAM Construct UK
Other Project Contributors: Bennetts Associates - Concept Architects, E3, Anderson Green & Arup, Galldris, B&K Structures, Michael J Lonsdale & Wallrite, Binder
Sponsored by:

COMMUNITY ENGAGEMENT INITIATIVE OF THE YEAR
Winner:
Balfour Beatty
Manchester Engineering Campus Development
Highly Commended:
VGC Group
Go Beyond the Gates
Finalists:
Balfour Beatty
Manchester Engineering Campus Development
Bowmer + Kirkland
Fosse Park West and Food Central
Cumbria County Council
Pooley Bridge, Cumbria
MSVF JV
Barking Riverside Social Value Strategy
VGC Group
Go Beyond the Gates
WM Longreach
Regency Restoration Project Education and Community Engagement Plan
Sponsored by:

COMMERCIAL PROPERTY PROJECT OF THE YEAR
Winner:
100 Liverpool Street, London
Commissioning Authority: British Land
Lead Architect: Hopkins Architects
Lead Consultant: Hopkins Architects
Lead Contractor: Sir Robert McAlpine
Other Project Contributors: Universal Design Studio, Veretec, HED, AKT II, Chapman BDSP, Arup, Billings Design Partnership, Speirs & Major, M3 Consulting, Erith, Keltbray, Realtime, William Hare, Lesterose, Focchi, Seele, Colorminium, LBS, Willerby Landscaping, ASG, TMJ, LDD, Dane
Highly Commended:
Llys Cadwyn redevelopment, Pontypridd
Commissioning Authority: Rhondda Cynon Taf County Council
Lead Architect: Darnton B3
Lead Consultant: Hydrock
Lead Contractor: Willmott Dixon Construction
Other Project Contributors: Darnton B3, Hydrock, Willmott Dixon Construction, Rhomco
Finalists:
11 - 21 Canal Reach
Commissioning Authority: Kings Cross Central Limited Partnership (KCCLP)
Lead Architect: Bennetts Associates
Lead Consultant: BAM Design
Lead Contractor: BAM Construct UK
Other Project Contributors: Bennetts Associates - Delivery Architects, BAM Design - Structures, M&E & BREEAM, Ramboll UK Structures & Geotechnics, ALD - Landscape, JGA - Fire, Sandy Brown - Acoustics, Focchi, Getjar, Kone & BAM Services Engineering, IDSL, Schuco, Aco Technologies
22 Bishopsgate
Commissioning Authority: Lipton Rogers
Lead Architect: PLP Architecture
Lead Consultant: WSP UK
Lead Contractor: Multiplex
100 Liverpool Street
Commissioning Authority: British Land
Lead Architect: Hopkins Architects
Lead Consultant: Hopkins Architects
Lead Contractor: Sir Robert McAlpine
Other Project Contributors: Universal Design Studio, Veretec, HED, AKT II, Chapman BDSP, Arup, Billings Design Partnership, Speirs & Major, M3 Consulting, Erith, Keltbray, Realtime, William Hare, Lesterose, Focchi, Seele, Colorminium, LBS, Willerby Landscaping, ASG, TMJ, LDD, Dane
Fosse Park West/Food Central
Commissioning Authority: The Crown Estate
Lead Architect: Corstorphine + Wright
Lead Consultant: Corstorphine + Wright
Lead Contractor: Bowmer + Kirkland
Other Project Contributors: Dunnett Craven (Food Central), MacGregor Smith (Landscaping),McDermotts, Hambleton Steel, Keyclad, Caxton Builders, Vitrine Systems, PHP, Mellor Bromley, Danaher and Walsh, Gavin Jones, Fox Lloyd Jones, WSP, Hoare Lea
Llys Cadwyn redevelopment, Pontypridd
Commissioning Authority: Rhondda Cynon Taf County Council
Lead Architect: Darnton B3
Lead Consultant: Hydrock
Lead Contractor: Willmott Dixon Construction Limited
Other Project Contributors: Darnton B3, Hydrock, Willmott Dixon Construction Limited, Rhomco
Pinewood Studios PSDF
Commissioning Authority: Pinewood Group
Lead Architect: Sir Robert McAlpine Design Group
Lead Consultant: Sir Robert McAlpine Design Group
Lead Contractor: Sir Robert McAlpine
Other Project Contributors: Sir Robert McAlpine Design Group, Billington Holdings - Steelwork. Creagh - Concrete
Quarry Studios
Commissioning Authority: Moxon Architects
Lead Architect: Moxon Architects
Lead Consultant: Moxon Architects
Lead Contractor: Moxon Architects
Other Project Contributors: Tor Contracting, Logie Timber Yard, Vola, Zumtobel, Kalzip & Russwood Timber
The Post Building
Commissioning Authority: Brockton Capital and Oxford Properties
Lead Architect: Allford Hall Monaghan Morris
Lead Consultant: Allford Hall Monaghan Morris
Lead Contractor: Laing O'Rourke Construction
Other Project Contributors: Gardiner and Theobald, Arcadis, Arup, Metallbau Fruheh, OAG

DIGITAL INITIATIVE OF THE YEAR
Winner:
Anglian Water's Strategic Pipeline Alliance
A Geospatial Digital Solution
Highly Commended:
Arup
Virtual Asset Tours – improving safety and efficiency of effective asset management in the water industry
Finalists:
Anglian Water
Anglian Water’s Strategic Pipeline Alliance
Arup
Virtual Asset Tours – improving safety and efficiency of effective asset management in the water industry
Balfour Beatty
A2 Bean and Ebbsfleet junction improvement scheme
BIM-UK
Digital Project Management Plan - Yorkshire Water AMP7 Capital Programme
Biosite Systems
Biosite – Delivering 100% conformance through collaboration for CSJV
Costain
Digital Progressive Assurance at the Gatwick Station Project
PERI
PERI QuickSolve – Free Online Formwork Design Application
Sensat, Osborne and Connect Plus
Digitising the M25

CULTURAL & LEISURE PROJECT OF THE YEAR
Winner:
Manchester Jewish Museum
Commissioning Authority: Manchester Jewish Museum
Lead Architect: Citizen Design Bureau
Lead Consultant: Buro Happold
Lead Contractor: HHSmith
Other Project Contributors: Citizen Design Bureau, Buro Happold, Buro Four, Appleyard & Trew, All Things, SmithersPurslow, Cubic, Roof Glaze, Britain & Co
Highly Commended:
Welcome Building RHS Garden Bridgewater, Manchester
Commissioning Authority: Royal Horticultural Society
Lead Architect: Hodder + Partners
Lead Consultant: Hodder + Partners
Lead Contractor: Bam Construction UK
Other Project Contributors: ROC Consulting, Hoare Lea, Arcadis, Tom Stuart-Smith, Bam Construction UK , HESS Timber, REDS Joinery, Bennetts Architectural Aluminium Solutions , APEX Flooring, Maple Sunscreening
Finalists:
Bodmin Jail Hotel, Cornwall
Commissioning Authority: Mallino Development Group
Lead Architect: Twelve Architects & Masterplanners
Lead Consultant: Total Project Integration
Lead Contractor: CField Construction
Other Project Contributors: Twelve Architects & Masterplanners, ARUP, CField Construction
King’s Cross Sports Hall
Commissioning Authority: Kings Cross Central Limited Partnership (KCCLP)
Lead Architect: Bennetts Associates
Lead Consultant: Bennetts Associates
Lead Contractor: BAM Construction
Other Project Contributors: Stride Treglown (Executive Architects), Arup (Structural & Geotechnical Engineers), E3 (M&E Engineers) G&T (Cost Consultant), Townshend (Landscape Consultant), Binderholz
Manchester Jewish Museum
Commissioning Authority: Manchester Jewish Museum
Lead Architect: Citizen Design Bureau
Lead Consultant: Buro Happold
Lead Contractor: HHSmith
Other Project Contributors: Citizen Design Bureau, Buro Happold, Buro Four, Appleyard & Trew, All Things, SmithersPurslow, Cubic , Roof Glaze, Britain & Co
Welcome Building RHS Garden Bridgewater
Commissioning Authority: Royal Horticultural Society
Lead Architect: Hodder + Partners
Lead Consultant: Hodder + Partners
Lead Contractor: BAM Construction UK
Other Project Contributors: ROC Consulting, Hoare Lea, Arcadis, Tom Stuart-Smith, BAM Construction UK , HESS Timber, REDS Joinery, Bennetts Architectural Aluminium Solutions, APEX Flooring, Maple Sunscreening

ENVIRONMENT & SUSTAINABILITY INITIATIVE OF THE YEAR
Winner:
JBA Bentley
Great Yarmouth Tidal Defences Epoch 2
Finalists:
Civic Engineers
Better Queensway, Southend-on-Sea
Hodder and Partners
The Welcome Building, RHS Garden Bridgewater
Jacobs
HS2’s Colne Valley Western Slopes Habitat Creation Project
JBA Bentley
Great Yarmouth Tidal Defences Epoch 2
Places for People
DREEAM Padiham
Sponsored by:

SOCIAL INFRASTRUCTURE PROJECT OF THE YEAR
Winner:
UWE Engineering Building, Bristol
Commissioning Authority: University of the West of England
Lead Architect: AHR
Lead Consultant: Hydrock
Lead Contractor: Bam Construction
Other Project Contributors: AHR, Hydrock, Bam Construction, Mace (QS), Capita (PM)
Highly Commended:
The Dragon's Heart Hospital, Cardiff
Commissioning Authority: Cardiff and Vale University Health Board
Lead Architect: BDP
Lead Consultant: Mott MacDonald Limited
Lead Contractor: ESG Global
Other Project Contributors: BDP, Hoare Lea, Archus, Q5, ESG Global, IPD, Declan Sherry
Finalists:
Christ the Word Catholic School
Commissioning Authority: Denbighshire County Council
Lead Architect: AHR Architects
Lead Consultant: Mott MacDoanld
Lead Contractor: Kier Construction Limited
Cranmer Road, King's College
Commissioning Authority: King’s College Cambridge
Lead Architect: Allies and Morrison
Lead Consultant: Allies and Morrison
Lead Contractor: RG Carter
Other Project Contributors: Smith & Wallwork, Max Fordham LLP, Faithful + Gould, Warm, LDA Design, Cambridge Architectural Precast, Modular Clay Products, Saffron Brickwork
Downing Place United Reformed Church
Commissioning Authority: Downing Place URC
Lead Architect: Archangel Architects
Lead Consultant: Bremner Partnership
Lead Contractor: Coulson Building Group
Other Project Contributors: Archangel Architects, Andrew Firebrace Partnership & David Bedwell, Coulson Building Group .
Health Innovation One, Lancaster University
Commissioning Authority: Lancaster University
Lead Architect: John McAslan + Partners
Lead Consultant: Identity Consultant
Lead Contractor: BAM Construction
Other Project Contributors: John McAslan + Partner, Identity Consultant, WYG, SDA Consulting
Inverness Justice Centre
Commissioning Authority: Scottish Courts and Tribunals Service (SCTS)
Lead Architect: Reiach and Hall Architects
Lead Consultant: Reiach and Hall Architects
Lead Contractor: Robertson Group
Other Project Contributors: Horner + MacLennan, ARUP, Currie & Brown
The Alder Centre
Commissioning Authority: Alder Hey Children's Hospital
Lead Architect: Allford Hall Monaghan Morris
Lead Consultant: Allford Hall Monaghan Morris
Lead Contractor: Whitfield and Brown (Developments)
Other Project Contributors: Architect, BBUK, Elliott Wood, David Stillman Associates, PT Projects,Whitfield and Brown (Developments), SCP, RB12, Dornbract, VitrA
The Deaf Academy, Exmouth
Commissioning Authority: Exeter Royal Academy for Deaf Education
Lead Architect: Stride Treglown
Lead Consultant: Hydrock
Lead Contractor: Midas Construction
Other Project Contributors: Stride Treglown, Hydrock, Midas Construction, SDS, AECOM, Stace LLP
The Dragon's Heart Hospital, Cardiff
Commissioning Authority: Cardiff and Vale University Health Board
Lead Architect: BDP
Lead Consultant: Mott MacDonald Limited
Lead Contractor: ESG Global
Other Project Contributors: BDP, Hoare Lea, Archus, Q5, ESG Global, IPD, Declan Sherry
UWE Engineering Building, Bristol
Commissioning Authority: University of the West of England
Lead Architect: AHR
Lead Consultant: Hydrock
Lead Contractor: BAM Construction
Other Project Contributors: AHR, Hydrock, BAM Construction, Mace (QS), Capita (PM)

HEALTH, SAFETY & WELLBEING INITIATIVE OF THE YEAR
Winner:
Skanska Costain STRABAG JV (SCS JV), Cementation Skanska and Hercules Site Services
Zero Trim Piles
Highly Commended:
Eave
Protecting highways workers from noise-induced hearing loss - a new approach by Galliford Try Highways and Eave
Finalists:
3D Repo
Project TIME: Project Training and Inductions Made Easy
AG
AG Go Home Safe Campaign
Connect Plus working in Partnership with Steve Perkins Associates
Healthier Highways on the M25 - Connect Plus working in Partnership with Steve Perkins Associates
Eave
Protecting highways workers from noise-induced hearing loss - a new approach by Galliford Try Highways and Eave
Jacobs
One Million Lives Free Mental Health Check-In Tool
National Grid
National Grid – Mental Health and Suicide Prevention Project
North London Waste Authority
Beable on North London Heat and Power Project
Triton Knoll
Triton Knoll Onshore Electrical System – Start Safe, Act Safe, Home Safe, Drive Safe Initiative
Skanska Costain STRABAG JV (SCS JV), Cementation Skanska and Hercules Site Services
HS2 MWCC S1/S2 Contract

TRANSPORT PROJECT OF THE YEAR
Winner:
Rochester Bridge Refurbishment Project
Commissioning Authority: Rochester Bridge Trust
Lead Architect: Rochester Bridge Trust
Lead Consultant: Arcadis
Lead Contractor: FM Conway
Finalists:
A46 Anstey Lane Infrastructure Upgrade
Commissioning Authority: Leicestershire County Council
Lead Architect: Leicestershire County Council
Lead Consultant: Leicestershire County Council
Lead Contractor: Galliford Try
Other Project Contributors: Leicester City Council, Kier on behalf of Highways England, CR Civil Engineering, Mason Street Furniture, Aggregate Industries, Roadway UK Traffic Management, Siemens, Aggregate Industries, CR Civil Engineering, Mason Street Furniture, Burdens of Nottingham
Chimneys Link Road Improvement Scheme
Commissioning Authority: Welsh Government
Lead Architect: Atkins
Lead Consultant: Atkins
Lead Contractor: Alun Griffiths (Contractors)
Other Project Contributors: Local authority client, Pembrokeshire County Council. Maintaining Agent - South Wales Trunk Road Agent.
Rochester Bridge Refurbishment Project
Commissioning Authority: Rochester Bridge Trust
Lead Architect: Rochester Bridge Trust
Lead Consultant: Arcadis
Lead Contractor: FM Conway
Sponsored by:

PARTNERSHIP INITIATIVE OF THE YEAR
Winner:
Greater London Authority/Thames Water/Transport for London/Cadent/SGN/UK Power Networks
London Infrastructure Coordination Service – Collaborative Streetworks Partnering Project
Highly Commended:
AIMP Partnership: UKRI/NERC/BAS, Ramboll, BAM, Sweco
Antarctic Infrastructure Modernisation Programme - British Antarctic Survey
Finalists:
Balfour Beatty and Wokingham Borough Council
Wokingham Major Highways Project
AIMP Partnership: UKRI/NERC/BAS, Ramboll, BAM, Sweco
Antarctic Infrastructure Modernisation Programme - British Antarctic Survey
Greater London Authority/Thames Water/Transport for London/Cadent/SGN/UK Power Networks
London Infrastructure Coordination Service – Collaborative Streetworks Partnering Project

UPGRADE & RENEWAL PROJECT OF THE YEAR
Winner:
Northern Ammunition Jetty (Glen Mallan)
Commissioning Authority: Defence Infrastructure Organisation
Lead Architect: Alan Kilbride
Lead Consultant: Arch Henderson and Partners
Lead Contractor: VolkerStevin
Other Project Contributors: Arup, Houlder, Wood Group, DSSR, Jacobs,VolkerStevin , Kenz Figee
Highly Commended:
Burton Flood Risk Management Scheme
Commissioning Authority: The Environment Agency
Lead Architect: Binnies
Lead Consultant: Binnies
Lead Contractor: Galliford Try
Other Project Contributors: Aecom, Arcadis, Turner & Townsend, ATM
Finalists:
A6195 Corridor Improvement Works
Commissioning Authority: Barnsley Metropolitan Borough Council
Lead Contractor: nmcn
Bentley Ings Pumping Station Upgrade
Commissioning Authority: Environment Agency
Lead Architect: Environment Agency
Lead Consultant: JBA Bentley
Lead Contractor: JBA Bentley
Other Project Contributors: Turner & Townsend- ECC PM & ECC Supervisor, Arcadis- Cost Consultant, Jacobs- Environmental Clerk of Works & Principal Designer
Bodmin Jail Hotel, Cornwall
Commissioning Authority: Mallino Development Group
Lead Architect: Twelve Architects & Masterplanners
Lead Consultant: Total Project Integration
Lead Contractor: Cfield Construction
Other Project Contributors: Twelve Architects & Masterplanners, ARUP, CField Construction
Burton Flood Risk Management Scheme
Commissioning Authority: The Environment Agency
Lead Architect: Binnies
Lead Consultant: Binnies
Lead Contractor: Galliford Try
Other Project Contributors: AECOM, Arcadis, Turner & Townsend, ATM
Glasgow Queen Street Station Redevelopment
Commissioning Authority: Delivered by Network Rail on behalf of Transport Scotland
Lead Architect: IDP Architects
Lead Consultant: ARUP
Lead Contractor: Balfour Beatty
Other Project Contributors: BDP Architects, Idp Architects, ARUP, Balfour Beatty, Dem-Master Demolition, J&D Pierce, Charles Henshaw & Sons Limited
Katrine Aqueduct Refurbishment
Commissioning Authority: Scottish Water
Lead Contractor: George Leslie
Other Project Contributors: MRS Training and Rescue
Northern Ammunition Jetty (Glen Mallan)
Commissioning Authority: Defence Infrastructure Organisation
Lead Architect: Alan Kilbride
Lead Consultant: Arch Henderson and Partners
Lead Contractor: VolkerStevin Limited
Other Project Contributors: Arup, Houlder, Wood Group, DSSR, Jacobs,VolkerStevin Limited, Kenz Figee
Rochester Bridge Refurbishment Project
Commissioning Authority: Rochester Bridge Trust
Lead Architect: Rochester Bridge Trust
Lead Consultant: Arcadis
Lead Contractor: FM Conway
Shugborough Tunnel Stabilisation Shaft Filling
Commissioning Authority: Network Rail
Lead Contractor: Geobear
The Water Tower
Commissioning Authority: Dennis Pedersen
Lead Architect: Tonkin Liu
Lead Consultant: Tonkin Liu
Lead Contractor: MNB Services
Other Project Contributors: Tonkin Liu, Mervyn Rodrigues, Integration,MNB Services, GLW Engineering & Construction, Binderholz UK, Easter Commercia
Wembley 5 Pedway 0
Commissioning Authority: Quintain (in partnership with London Borough of Brent)
Lead Architect: vPPR Architects & Dixon Jones
Lead Consultant: vPPR Architects & Dixon Jones
Lead Contractor: Volker Fitzpatrick
Other Project Contributors: Gross Max (Landscape - 'Avenue of Champions' trees, Speirs & Major (Lighting), Expedition Engineering (Structure), Buro Happold (Civils), Wild Input (Project management)

PRODUCT INNOVATION OF THE YEAR
Winner:
PERI
PERI InSite Pressure Sensors for Formwork Systems
Highly Commended:
Velo Tech Systems
V-Deck: A Suspended Work Platform Delivering Time, Cost & Safety Benefits
Finalists:
Balfour Beatty
Virtual Information Customer Portal for the M25 Junction 10/A3 Wisley Interchange Improvement Scheme
Brilliant Ideas
Hole Cover: Temporary Solution. Improving Construction Site Safety
Brilliant Ideas
ALIMATS® Interlocking Outrigger Mat System. Unique. Patented. Handleable.
Optrel AG
Optrel Swiss Air TH3 Mask
PERI
PERI SONO WZ - water to cement ratio sensor
PERI
PERI InSite Pressure Sensors for Formwork Systems
Milwaukee Tool UK
Milwaukee MX FUEL™ 25kg class 28mm Hex Demolition Hammer brings sustainable, safe performance to civil engineering
Velo Tech Systems
V-Deck: A Suspended Work Platform Delivering Time, Cost & Safety Benefits

UTILITY PROJECT OF THE YEAR
Winner:
Anchorsholme Outfall Pumping Station, Lancashire
Commissioning Authority: United Utilities
Lead Architect: United Utilities
Lead Consultant: Jacobs (part of the C2V+ Joint Venture)
Lead Contractor: VolkerStevin (part of the C2V+ Joint Venture)
Other Project Contributors: Jacobs, VolkerStevin, Ward & Burke Construction, Gallaway Construction, Eric Wright Civil Engineering
Highly Commended:
Hallbank Tunnel Replacement Pipeline, Cumbria
Commissioning Authority: United Utilities
Lead Consultant: Mott MacDonald Bentley
Lead Contractor: Mott MacDonald Bentley
Other Project Contributors: Waitings, Environmental Fabrications, Smythy's Consultants, FT Pipelines, Freeflow Pipesystems, AVK
Finalists:
Anchorsholme Outfall Pumping Station
Commissioning Authority: United Utilities
Lead Architect: United Utilities
Lead Consultant: Jacobs (part of the C2V+ Joint Venture)
Lead Contractor: VolkerStevin Limited (part of the C2V+ Joint Venture)
Other Project Contributors: Jacobs, VolkerStevin, Ward & Burke Construction, Gallaway Construction, Eric Wright Civil Engineering
Childrey Warren Abstraction Closure Scheme
Commissioning Authority: Thames Water Utilities
Lead Consultant: Stantec
Lead Contractor: SMB JV
Other Project Contributors: J Browne Construction, Bridges, LJR Engineering, GPS, AVK, KSB, Quantum, Power Electrics
Hallbank Tunnel Replacement Pipeline
Commissioning Authority: United Utilities
Lead Consultant: Mott MacDonald Bentley
Lead Contractor: Mott MacDonald Bentley
Other Project Contributors: Waitings, Environmental Fabrications, Smythy's Consultants, FT Pipelines, Freeflow Pipesystems, AVK
The Tower of Light
Commissioning Authority: Manchester City Council
Lead Architect: Tonkin Liu
Lead Consultant: Tonkin Liu
Lead Contractor: Vital Energi
Other Project Contributors: Tonkin Liu, Bradshaw Gass & Hope, ARUP, SEAM Design, Turley, Shawton Engineering, M-Tec, Tryka, Darwen Terracotta
Sponsored by:

TEMPORARY WORKS INITIATIVE OF THE YEAR
Winner:
Ferrovial Construction Laing O’Rourke JV
Blackfriars Bridge Foreshore Floating Culvert (Tideway)
Finalists:
Carey Group
One Nine Elms
Ferrovial Construction Laing O’Rourke JV
Blackfriars Bridge Foreshore Floating Culvert (Tideway)
McGee
30 South Colonnade: Maintaining stability during core relocation
National Grid
River Humber Gas Pipeline Replacement Project
Sir Robert McAlpine
Elizabeth Tower Scaffold support Gantry
Sir Robert McAlpine
1-5 Grosvenor Place, London - 25m deep basement construction
Tony Gee and Partners LLP
Werrington Grade Separation – Curved Jacked Portal

NIC DESIGN PRINCIPLES AWARD
Winner:
Replacement Pooley Bridge, Cumbria
Commissioning Authority: Cumbria County Council
Lead Architect: Knight Architects
Lead Consultant: Mott MacDonald
Lead Contractor: Eric Wright Civil Engineering
Other Project Contributors: Knight Architects, GHD, Eric Wright Civil Engineering , WEC
Highly Commended:
The Tower of Light, Manchester
Commissioning Authority: Manchester City Council
Lead Architect: Tonkin Liu
Lead Consultant: Tonkin Liu
Lead Contractor: Vital Energi
Other Project Contributors: Tonkin Liu, Bradshaw Gass & Hope, Arup, SEAM Design, Turley, Shawton Engineering, M-Tec,Tryka, Darwen Terracotta
Finalists:
Boston Barrier Scheme
Replacement Pooley Bridge UK's First Stainless Steel Road Bridge
Rochester Bridge Refurbishment Project
Tower of Light by Tonkin Liu
Anchorsholme Outfall Pumping Station - improving bathing waters on the Fylde coast
The transformation of Olympic Way, Wembley, for Quintain in partnership with the London Borough of Brent
Supported by:

INDUSTRY TRANSFORMATION AND INNOVATION CHAMPION
Winner:
Mackenzie Construction and Scottish Canals
North Glasgow Integrated Water Management System (NGIWMS) – Glasgow’s Smart Canal
Highly Commended:
Skanska Costain STRABAG Joint Venture
Zero Trim Piles
Finalists:
Mackenzie Construction and Scottish Canals
North Glasgow Integrated Water Management System (NGIWMS) – Glasgow’s Smart Canal
THP JV (a JV between nmcn and Mott MacDonald Bentley
Stoke Bardolph Advanced Anaerobic Digestion Project
Skanska Costain STRABAG Joint Venture
HS2 MWCC S1/S2 Contract
Supported by:

INITIATIVE OF THE YEAR AWARD
Winner:
Mackenzie Construction and Scottish Canals
North Glasgow Integrated Water Management System (NGIWMS) – Glasgow’s Smart Canal
Finalists:
Anglian Water's Strategic Pipeline Alliance - A Geospatial Digital Solution
Balfour Beatty - Manchester Engineering Campus Development
Ferrovial Construction Laing O’Rourke JV - Blackfriars Bridge Foreshore Floating Culvert (Tideway) – Ferrovial Construction Laing O’Rourke JV
Greater London Authority/Thames Water/Transport for London/Cadent/SGN/UK Power Networks -London Infrastructure Coordination Service – Collaborative Streetworks Partnering Project
Jacobs and the Environment Agency - Carbon reduction in the use of concrete
JN Bentley - Great Yarmouth Tidal Defences Epoch 2
PERI - PERI InSite Pressure Sensors for Formwork Systems
Skanska Costain STRABAG JV (SCS JV), Cementation Skanska and Hercules Site Services - Zero Trim Piles

SMALL PROJECT OF THE YEAR
Winner:
Manchester Jewish Museum
Finalists:
A46 Anstey Lane Infrastructure Upgrade, Leicestershire
A6195 Corridor Improvement Works, Rotherham
Bentley Ings Pumping Station, Doncaster
Childrey Warren Abstraction Closure Scheme, Oxfordshire
Chimneys Link Road Improvement Scheme, Pembrokeshire
Downing Place United Reformed Church, Cambridge
Katrine Aqueduct Refurbishment, Stirlingshire
Quarry Studios, Aberdeenshire
Replacement Pooley Bridge, Cumbria
Shugborough Tunnel Stabilisation Shaft Filling, Stafford
The Alder Centre, Liverpool
The Tower of Light, Manchester
The Water Tower, Norfolk

PROJECT OF THE YEAR AWARD
Winner:
UWE Engineering Building, Bristol
Finalists:
100 Liverpool Street, London
Anchorsholme Outfall Pumping Station, Lancashire
Boston Barrier Scheme, Lincolnshire
Manchester Jewish Museum
Northern Ammunition Jetty (Glen Mallan)
Rochester Bridge Refurbishment Project
Supported by: